| Item type | Current library | Call number | Status | Date due | Barcode | |
|---|---|---|---|---|---|---|
Book
|
ISID | 338.476278(54) R161.SE (Browse shelf(Opens below)) | Available | DP1133 | ||
Book
|
ISID | 338.476278(54) R161.SE (Browse shelf(Opens below)) | Available | DP11097 |
Browsing ISID shelves Close shelf browser (Hides shelf browser)
| No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
| 338.476278(54) M664.SO Scheduling the operations of the bhakra system; studies in technical and economic evaluation | 338.476278(54) M664.SO Scheduling the operations of the bhakra system; studies in technical and economic evaluation | 338.476278(54) M664.SO Scheduling the operations of the bhakra system; studies in technical and economic evaluation | 338.476278(54) R161.SE Some economic aspects of the Bhakra Nangal project | 338.476278(54) R161.SE Some economic aspects of the Bhakra Nangal project | 338.476278(549) W927.WP Water and power resources of West Pakistan : a study in sector planning / | 338.47629227(52) In39.RC Real condition of bicycle industry in Osaka |
There are no comments on this title.
Log in to your account to post a comment.

Text